NASA Crew Completes Seventh of Eight New Solar Arrays on the International Space Station

Upcoming November 5 spacewalk set to finish years-long power upgrade as Artemis planning continues.

NASA Crew Completes Seventh of Eight New Solar Arrays on the International Space Station
NASA astronaut Anil Menon rides the Canadarm2 robotic arm to begin the installation of a roll-out solar array on the International Space Station’s port-side truss structure while orbiting 260 miles above Earth. © NASA

NASA astronaut Anil Menon and Canadian Space Agency astronaut Joshua Kutryk completed a spacewalk on October 29 that installed and unfurled the seventh of eight new roll-out solar arrays on the International Space Station. The arrays are designed to raise the station’s power generation capacity by as much as 30 percent and keep the orbital laboratory fully powered through its planned decommissioning around 2030. A final spacewalk, designated US EVA-101, is scheduled for November 5 to install the eighth array and complete the multi-year upgrade.

The October 29 excursion focused on the station’s truss structure. The pair successfully deployed the new array after preparatory work by the Expedition 75 crew earlier in the week. Station power systems have relied on older arrays for more than two decades; the roll-out replacements are lighter, more efficient, and easier to install during short extravehicular activities. Once the final array is online, the station will have greater margin for research payloads, life-support systems, and visiting vehicles.

The upgrade arrives as NASA continues refining plans for Artemis missions. On October 23, Administrator Jared Isaacman and other agency leaders outlined an accelerated path aimed at returning astronauts to the lunar surface in 2028. Artemis III, scheduled for next year, will send a crew of four to low Earth orbit to test rendezvous and docking procedures with commercial human landing systems. SpaceX has been selected to provide laser communications for that flight, allowing high-rate imagery from Orion. Blue Origin remains a contender for later landing-system work. Stacking of solid rocket booster segments for the Artemis III Space Launch System rocket has already been completed at Kennedy Space Center.

While the station’s solar-array work is near completion, NASA continues routine science operations. Crew members recently ran experiments with a 3D bioprinter and a levitation furnace. Ten people are currently in space across the station and other vehicles. The combination of steady station maintenance and ongoing Artemis hardware progress keeps U.S. human spaceflight active on two fronts: sustained low-Earth-orbit operations and preparations for lunar return.

The November 5 spacewalk is expected to be the last major installation of the current solar-array campaign. Successful completion would close one of the longest infrastructure projects on the station and free engineering resources for other maintenance and for supporting commercial and government vehicles that will continue visiting through the end of the decade. For now, the station’s power system is one step closer to the configuration that will carry it through the remainder of its operational life.